ServicesIndustriesResultsService AreaSafety & ComplianceContactRequest a Quote
‹ All methodsMethod 03

Sand Blasting

Strip it to bare metal — and leave the profile a coating needs.

How it works

Removal and profile, in one pass.

Media driven by compressed air does two jobs at once. It strips the coating, rust or scale off, and it cuts an anchor profile — measured in mils — that the next coating mechanically grips. Clean without profile is an incomplete spec.

Coating datasheets call out both a cleanliness standard and an anchor profile

What it removes
Bonded coatingPitted rustMill scaleFlash rustWeld slagSpatterLaitanceCorrosion products
Angular abrasive mediaAnchor profile, 1–4 mils
01Media strips02Surface profiled03Coating grips

Media

MediaAggressivenessUse
Coal / copper slagHigh ~7.5 MohsFast, economical single-use strip and etch
GarnetHigh ~7.5–8Low dust, recyclable, low free silica
Crushed glassMedium 5–6Silica-free, recycled, economical stripping
Aluminum oxideVery high 8–9Sharp, reusable, fast etch and profile
Steel shot / gritVery highGrit strips at 2–4 mil profile; shot peens and polishes
SodaVery low ~2.5Non-destructive, water-soluble, no profile
Walnut / corn cobLowDelicate stripping without cutting

What your customers write into a spec

StandardWhat it means
SSPC-SP 1Solvent clean. Degrease first, always — blasting over oil drives it in.
SSPC-SP 5 / NACE 1White metal. 100% free of everything. Immersion, tank linings.
SSPC-SP 10 / NACE 2Near-white. Staining on 5% or less. The marine workhorse.
SSPC-SP 6 / NACE 3Commercial. Staining under 33%. Most structural steel.
SSPC-SP 7 / NACE 4Brush-off. Loose material off, tight material can stay.
ICRI CSP 1–10Concrete surface profile for coatings and overlays.

ISO equivalents: SP 5 ≈ Sa 3 · SP 10 ≈ Sa 2½ · SP 6 ≈ Sa 2 · SP 7 ≈ Sa 1

Right for

Structural steel, weld prep, tanks and vessels
Trailers, frames, buckets, attachments
Bridges, towers and marine decks
Concrete profiling before coatings or overlays
Built for coatingRemoves mill scaleMeasured profileMatched media

Wrong for

Precision gearIt cuts. Never on electrical gear, electronics, tooling, thin sheet or dimension-critical parts.
Historic fabricAbrasive destroys the fired face of historic brick and is disallowed on most rehab tax-credit work. Dry ice or soda instead.
Occupied areasDust and containment are their own project. Occupied or food-production areas need wet blasting or another method.
Lead coatingsPresumed exposure is 2,500 µg/m³ — 50× the OSHA PEL — until an assessment says otherwise.
Spent mediaLead or heavy metal makes waste you own, characterized and disposed of accordingly.

Wet vs dry. Wet blasting adds water at the nozzle for dust control, with matching standards — SP 10(WAB) / NACE WAB-2 — at the same cleanliness. The variable is flash rust, graded none to heavy and managed with inhibitors. Choose wet when dust cannot travel: occupied plants, adjacent equipment, silica or lead, spark risk.

Standards & compliance

Respirable silica PEL 50 µg/m³ TWA.29 CFR 1910.1053 / 1926.1153
NIOSH-approved supplied-air blast helmet.29 CFR 1910.94(a)
Lead exposure and hygiene controls.29 CFR 1926.62
Confined space entry for tank interiors.29 CFR 1910.146

Typical jobs

  • Tank exterior to SP 10 before recoat
  • Trailer frames and dump bodies
  • Structural steel during a shutdown
  • Barge deck prep
  • Slab profiled to CSP 3 for epoxy

Questions we get

What SSPC standard do I need?

The coating specification decides. SP 10 is common for marine and industrial work, SP 6 for structural steel, SP 5 for immersion and tank linings.

Do you wet blast for dust control?

Yes, where dust cannot travel. Wet blasting has matching standards at the same cleanliness — the variable is flash rust, and the acceptable level is agreed before work starts.

Can you blast lead paint?

Lead changes the whole work plan: exposure assessment, respiratory protection, containment, hygiene facilities and characterized waste disposal, all before blasting starts.

Get a clear plan in 3 steps

01Share photos
02Get a method
03Get moving
Start a project →